Services
MEP engineering, from load calculations to certificate of occupancy
Four disciplines designed in-house by one team, plus the energy compliance, modeling and construction-phase support that gets a project permitted and built.
Mechanical and HVAC Engineering Design
Load calculations, equipment selection, duct and piping layouts, ventilation and controls, delivered as a sealed permit set.
Typical permit set in 2 to 4 weeks from approved scope, depending on size
Learn moreElectrical Engineering Design
Service sizing, panel schedules, one-line diagrams, lighting and controls, fire alarm, generators and EV charging.
Typical permit set in 2 to 4 weeks from approved scope
Learn morePlumbing and Gas Piping Design
Domestic water, sanitary and vent, storm, water heating, gas piping, grease interceptors and backflow prevention.
Typical permit set in 2 to 4 weeks from approved scope
Learn moreFire Protection Engineering Design
Sprinkler and standpipe design, hydraulic calculations, fire pumps, fire alarm and kitchen suppression coordination.
Typical permit set in 2 to 4 weeks from approved scope
Learn moreEnergy Code Compliance and Energy Modeling
COMcheck, REScheck, ASHRAE 90.1 and IECC compliance, energy models and commissioning documentation for permits.
Compliance forms in 3 to 5 business days when the drawings are complete
Learn moreBIM, Revit Modeling and Drafting Services
Revit MEP modeling, clash detection, scan-to-BIM, CAD-to-Revit conversion and drafting support for design teams.
Quoted per project based on model scope and level of detail
Learn moreConstruction Administration and As-Built Drawings
Plan review responses, submittals, RFIs, site visits, close-out letters and as-built drawings.
Plan review responses within 5 business days; RFIs within 2 business days
Learn moreQuick Services
Single deliverables with a stated turnaround
Load letters, calculations and compliance forms you can order without a proposal cycle.
- Electrical Load Letter 2 to 3 business days
- Manual J, S and D Calculations 3 to 5 business days
- Commercial HVAC Load Calculations 3 to 5 business days
- COMcheck and REScheck Energy Compliance 3 to 5 business days
- Gas Piping Design and Riser Diagram 3 to 5 business days
- Backflow Preventer Design and Application 3 to 5 business days
- Photometric Lighting Analysis 3 to 5 business days
- EV Charger Electrical Design 5 to 10 business days
- Standby Generator Sizing and Design 5 to 10 business days
- Electric Sub-Metering Design 5 to 10 business days
- Sprinkler Hydraulic Calculations 5 to 10 business days
Have a project in design or permitting?
Send us the drawings you have, even if they are early. We reply within one business day with scope, fee and schedule.