Electrical Load Letter
PE-sealed load calculation and letter for the utility, the landlord or the building department.
An electrical load letter states the existing and proposed electrical load for a space, calculated per NEC Article 220, and is signed and sealed by a licensed professional engineer. Utilities, landlords and building departments ask for it before approving a new service, a tenant’s equipment or a permit. We prepare them in two to three business days from a complete equipment list.
Need the full design instead? See Electrical Engineering Design.
Frequently asked questions
Who asks for a load letter?
Utilities before a new or upgraded service, landlords before approving tenant equipment, and building departments when a permit adds electrical load.
Do you need to visit the site?
Usually not. Panel photos and the equipment list are enough. We visit when the existing service cannot be documented remotely.
Have a project in design or permitting?
Send us the drawings you have, even if they are early. We reply within one business day with scope, fee and schedule.